Current Flooring Directions to Consider for Your Project
Explore current manufacturer and industry design directions, from tactile natural looks to expressive patterns, and decide which ideas deserve a place in your project.
Read the articleStairs connect floors visually as well as physically. Plan treads, risers, landings and edges together to create a coherent transition between levels.
A staircase is seen from several angles: from below, from the side and while moving between levels. Matching only the top of a tread to the main floor can leave the rest of that composition unresolved. Havwoods' stair guidance identifies treads, risers, nosings and profiles as distinct components to consider.
Start with a sketch or photograph of the entire stair. Mark which surfaces are visible from the entrance and living areas. Decide whether the staircase should blend into the flooring palette or become a contrasting architectural feature. That choice should guide the whole assembly, including landings and exposed side details.
Using related wood tones can connect the staircase to adjacent floors. A different riser color can introduce a clear rhythm, while a more unified treatment may make the stair feel quieter. Compare these possibilities with the wall color and railing rather than selecting the wood in isolation.
Avoid assuming that components with similar product names will match perfectly. Ask to see representative samples together, including any fabricated edges or nosings. Grain direction, finish and natural variation can affect the relationship. If exact continuity is difficult, a deliberate contrast may be more convincing than several surfaces that nearly match without looking intentionally different.
The lower and upper landings are where the stair joins the larger flooring plan. Review them together, even if only one level is receiving a new floor. Consider the view upward from the bottom and the view across the upper landing.
A patterned main floor does not necessarily need to continue as the same pattern on every tread. Discuss how a quieter stair treatment could relate through tone or material. Conversely, a plain floor can give a distinctive staircase more visual space. The key question is whether the transition feels resolved from each approach, not whether every surface repeats the same design move.
Stairs require more than a decorative flooring selection. Have the responsible installer or fabricator confirm suitable components, edge details and the requirements of the existing stair construction. Do not assume a field flooring plank can be used in any stair detail simply because its color is right.
Review the proposed finish alongside railings, wall treatments and lighting. For a commercial project, coordinate the appearance with the project's functional and accessibility requirements through the design team. Keep samples and drawings of the agreed components with the flooring specification. A coordinated staircase should connect levels visually while remaining a carefully detailed part of the building, with its edges and transitions considered from the beginning.
Explore current manufacturer and industry design directions, from tactile natural looks to expressive patterns, and decide which ideas deserve a place in your project.
Read the articleTurn loose samples into a useful specification board with accurate labels, realistic proportions and enough variation to judge the proposed floor in context.
Read the articleDecide how much personality and permanence you want from a floor. Use current inspiration thoughtfully while keeping architecture, daily life and future changes in view.
Read the article